February 28th, 2006 by Tom · No Comments · Nortel - California - Feb 27th - Mar 10th

ALL TIMES ARE PACIFIC STANDARD TIME!
Flight here. Got rental car about 14:00. Ate at IHOP. Arrived at Nortel at approximately 15:00. Got temp badge and set up laptops for use (ran cables and configured their IPs). Getting the badges required signing NDAs and other paperwork. We also had to watch a ten minute video on policy. We also had to run cables through their lab to get the laptops set up. We got in our rooms at the hotel at 17:53.

Tuesday morning 09:25 – Arrived at Nortel. Badges did not work. We had to wait for someone to walk out of the lab. We configured our switches to prepare for testing. I ran through the menuing system to familiarize myself with the use. We truthfully could not get anything accomplished due to lack of direction. At 12:00, we decided to get lunch. We went to lunch and then returned at about 13:45. During this time, we were talking to Tony Au and were instructed to get new badges that ours were “Daily”. So, each day, we have to get a new badge in the security building and each night turn in our old one. We were told that this will be the way until we get picture badges. We got back from the security department at about 14:15. I found one issue with the banner ranges and that is about all. It was not in the test plan but I was just running through the commands some more while Kevin configured the systems for test. Mike May at Perseus found this same issue at the same time I did. Kevin is going throught the test plan now and pointing out the items that we need and have to configure. We are going to have this information ready for the morning so they can retrieve it and configure it. Once that is complete, we feel strongly that the test plan can be completed in a week.

Tom B.

Tags:

No Comments so far ↓

There are no comments yet...Kick things off by filling out the form below.

Leave a Comment